36” QIT SPM3 Pipeline Crack Repair and BOP SPM Buoy Installation
Main Contractors: Rosetti Pivot Limited and WAV Consortium
Owner: Mobil Producing Nigeria Unlimited
This scope comprised Project & HSE management, Installation Engineering, Prefabrication, Transportation, Installation, and Commissioning for the installation of a new SPM stock Buoy and repair of 36” export line at the QIT SPM3 location, SPM 1 decommissioning and swap with removed SPM3 Buoy.