Revamping of Brass Export System Replacement of SPM2 CALM Buoy at NAOC Terminal Brass
Main Contractor: Rosetti Pivot Limited
Owner: Nigerian AGIP Oil Company
This contract covers the full EPCI, and the scope of work involves procurement and in-country assembly of the new SPM2 Buoy, in-country fabrication of PLEM, Anchor piles, System flushing and Isolation prior to Disconnection, Decommissioning and Towing of the existing system, Installation of new Buoy PLEM and Ancillaries. Commissioning and Classification of the new system, Supply of capital spares, and Geotechnical and Geological survey.
Technical Details
Approx. weight 285 tons
Dimensions
- Buoy Body Diameter 12 Mt
- Skirt Diameter 16 Mt
- Buoy Body Height 5.3 Mt